Major Road and Traffic Projects Tied to North River Farms
These are some of the most significant off-site improvements required as part of the development approval.
1) College Boulevard Bridge Expansion
Widening from 4 lanes to 6 lanes
Includes improved pedestrian and bicycle facilities
Intended to increase traffic capacity and evacuation routes
Estimated cost: about $4.5 million
Status: Construction has been underway in phases in recent years.
2) North River Road Widening
Expansion to more than double the existing width
One of the largest transportation changes tied to the project
Designed to accommodate increased traffic from the development
This project often appears under:
Subdivision improvement plans
Traffic mitigation measures
3) Highway 76 Intersection Improvements
Improvements to multiple intersections along State Route 76
Coordination with Caltrans
Focus on traffic flow and safety
Typical work includes:
Signal upgrades
Turn lanes
Traffic control changes
4) Vandegrift Boulevard / North River Road Turn Lane
New turning lane added at the intersection
Intended to reduce congestion and improve safety
5) Douglas Bridge Expansion Contribution
Developer required to contribute funding toward expansion of the bridge
Supports regional traffic circulation
No comments:
Post a Comment